The owners of this Lagoon F450 wanted to extend their teak deck to the fly-bridge stairs. Not an easy project, and we had to think about a specific methodology to solve, but everyone’s happy with the result. First we made mock structures of each of the stairs — 6 of them in total –, soContinue reading “Lagoon F450 teak stairs cover”
Category Archives: Carpentry
Lagoon 450 teak front cockpit
Normally the Lagoon 450 doesn’t come with a teak front cockpit. However, this owner wanted one matching the teak he had in the back. We started this project from scratch a couple of weeks ago. The initial structure is built in our workshop. Final adjustments and polishing are made on the yard. This is aContinue reading “Lagoon 450 teak front cockpit”
New galley on an 19m power boat
Last February, the German owners of m/v Jua, an 18,8m power boat, asked us to make numerous improvements and hull work, including a complete refit of their galley, furniture, topside and appliances. Of course, being a power boat, they didn’t have the usual constrains we have to cope with on our sailing boat clients. InContinue reading “New galley on an 19m power boat”
Lagoon 450F Bulkhead repair kit
You remember this bulkhead inspection we shared with you a few weeks back?Well, this Lagoon 450F unit from 2011 was indeed affected by the now infamous 450 bulkhead-gate. However, Lagoon is stepping up to deal with this properly, as they did with the previous units we encountered over the same issue. The owners submitted theContinue reading “Lagoon 450F Bulkhead repair kit”
New galley on a Lagoon 450F
The transition of ownership is usually the opportunity for some serious refit. This is what happened with this Lagoon 450F on which the new owners wanted a complete refit of the galley. It was about time, as the boat was still with all her legacy installation. The conception of this galley was the initial oneContinue reading “New galley on a Lagoon 450F”
Refit of a Lagoon 450F
One of our clients for many years decided to sell their catamaran in Licata this February. And as we knew the boat inside out, Massimo, her new owner, entrusted us with quite an extensive refit project here in Licata, together with some of our longstanding partners. All the jobs has to be completed rapidly, asContinue reading “Refit of a Lagoon 450F”
Motor yacht refit
The owners of m/v Jua wanted to spend some time in Licata for a long list of work, including hull treatment, propelling systems and some inside work also, not the least being the complete galley renovation. As for the hull, there is nothing more satisfying than a before/after view. We renovated the hull portholes, andContinue reading “Motor yacht refit”
Lagoon 450 bulkhead inspection
2020 was the year the Lagoon 450 “bulkhead-gate” got public. Basically, it seems many units in this range are affected by a flaw which would break the plywood front bulkhead. As there are over 1000 units of this range sailing all around the world, this topic quickly became the hot potato between Lagoon dealers andContinue reading “Lagoon 450 bulkhead inspection”
Mahogany and maple office table
This project was both a challenge and a statement. The shape was designed to make the perfect office table, and we wanted it to be both luxurious and solid. We wanted to achieve the same result as one can remember with the classic Riva Tritone’s of the 60’s. This implied a multi-layered transparent varnish whichContinue reading “Mahogany and maple office table”
Teak deck repair
This sailing yacht was showing quite some signs of weakness in many respect. The teak deck was in its original condition, with many signs of wear and water infiltration. The owner was considering a global renovation at some point, but he came to us with the starting point of repairing some of the foredeck teakContinue reading “Teak deck repair”
